Improvifi
All Case Studies
Decks & Outdoor Structures · 5 Sales Reps

$1.2 MILLION TO $10 MILLION IN THREE YEARS. WITH FIVE REPS.

This deck builder is three years old. They run five sales reps. And they are on pace for $10 million this year. No giant sales floor. No brand recognition head start. Just a team that never loses a job to "we can't afford it."

Multi-level composite deck with built-in garden beds and seating

Real contractor. Real numbers. Name protected. We keep our contractors' revenue confidential, and that includes yours. All figures below come directly from platform funding data.

The Results

By the numbers.

$10M

Annual revenue pace in year three

8x

Growth from year one ($1.2M) to today

91%

Of homeowner applications approved

$3.65M

Funded already this year

$2M

In revenue per sales rep

Background

THREE YEARS OLD. ZERO HEAD START.

This contractor builds custom decks and outdoor structures. A small deck runs $23,500. A large one runs $41,500.

Year one, they did $1.2 million. Solid for a brand-new company. Nowhere near where they wanted to be.

Here is the thing about decks: nobody needs one. There is no leak forcing the decision. No storm. No insurance check. Every single sale is a family choosing to spend serious money on something they simply want.

And a three-year-old company cannot outspend the big established players on marketing. So they had to win a different way. They had to close a higher percentage of the appointments they already had.

Custom covered elevated deck built by the contractor
The Challenge

EVERY LOST APPOINTMENT HURT TWICE AS MUCH.

When you run five reps instead of fifty, math gets brutal fast.

A big company can afford to burn appointments. A five-rep team cannot. Every homeowner who walks away is not just a lost deck. It is a lost slot on a calendar that only has so many slots.

Three problems stood between this builder and real growth:

  • Want purchases die on price. A $41,500 deck sounds like a dream until it sounds like a number. Without a payment path, "we love it" turns into "maybe next year."
  • One lender means one answer. Contractors with a single financing option watch a huge share of homeowners get declined. Every decline is a sold job handed back.
  • A small team cannot afford awkward money conversations. With five reps carrying the whole revenue target, every rep had to be great at presenting payments. Not just the natural closer. All five.
Blueprints and project plans
The Approach

EVERY JOB. EVERY OPTION. EVERY TIME.

They went all in. Improvifi is their exclusive financing platform, and the system runs on four rules.

  • Every job gets presented with payment options and promotional loans. Not some jobs. Not when the homeowner flinches. Every proposal walks in with monthly payments and promo offers already attached. The homeowner sees a path to yes before price ever becomes a wall.
  • The full Lending Ladder covers every homeowner. Unsecured prime for strong credit. Unsecured subprime for the family the last contractor turned away. Secured options when the project calls for it. That coverage is exactly why 91% of applications get approved.
  • All five reps trained through SKOOL. The financing conversation is not a talent on this team. It is a trained skill every rep runs the same way. The Improvifi SKOOL training turned payment presentation into muscle memory.
  • The App at the table, Deal Desk behind it. Reps run applications on the spot from the Improvifi App. When a deal gets complicated, the live Deal Desk and support team pick it up. Five reps in the field, a full financing operation behind them.
Marketing toolkit assets on a desk
The Results

SMALL TEAM. BIG COMPANY NUMBERS.

Three years in, this builder is pacing $10 million with five reps. That is $2 million in revenue per rep, productivity most fifty rep companies would kill for.

The numbers:

  • $10M — Annual revenue pace, up from $1.2M in year one
  • $3.65M — Funded already this year
  • 250+ — Homeowner applications in funding
  • 91% — Approval rate across the full credit spectrum
  • 100% — Of jobs presented with payment options and promo loans

The tickets did not shrink to get there. Small decks still average $23,500. Large decks still average $41,500. The projects stayed premium. The only thing that changed is how many homeowners could say yes to them.

Covered composite deck with gazebo built by the contractor

The Takeaway

APPROVAL RATE IS THE GROWTH LEVER NOBODY WATCHES.

Most contractors chase growth in two places: more leads and more reps. Both cost a fortune.

This builder grew 8x by pulling a cheaper lever. They stopped losing homeowners who already wanted the project.

Here is the math worth stealing. With one lender, a big share of applications never survive the credit check. This team sees 91% approved. On 250 applications, that gap is dozens of families. At an average ticket north of $23,000, that is millions of dollars a single lender contractor hands back every year without ever knowing it.

You do not need more appointments. You need more yeses inside the appointments you already have.

WE HELP YOUCLOSE MORE
JOBS.

Five reps built a $10M company on more yeses. Imagine your team with a 91% approval rate.